Summer putty construction problems and solutions
For building construction, the test brought by summer. One is the soaring temperature and the other is abundant rainfall. The suitable conditions for putty construction are that the temperature is 5-35°C and the air humidity is less than 85%. As an essential process of wall construction. If there is a problem with the construction effect